Şahinbey – Gaziantep, Türkiye+90 532 660 52 27info@seramekatronik.com
20 questions · 6 topics

Frequently Asked Questions

Answers to the questions investors ask us most before starting a greenhouse project. If yours is not here, write to us and we will answer for your project.

General

What does Sera Mekatronik do?

Sera Mekatronik is a greenhouse engineering company founded in Gaziantep in 2019. On modern greenhouse and soilless growing projects we handle every stage from a single source: feasibility, structural design, steel construction, climate automation, commissioning and operating support. Our founder, Serdar Yılmaz, has worked in greenhouses and electromechanical engineering since 2009.

Which crops do you build greenhouses for?

We build greenhouses for tomato, strawberry, blueberry, banana, pepper, vegetables, seedlings and hydroponic leafy greens; our completed projects also include hydroponic water culture, aquaponic and R&D greenhouses. Each crop needs its own gutter height, structural load and climate set-up, and our guides explain the difference for tomato, strawberry and banana.

Where have you built greenhouses?

Our 47 greenhouse projects are in 13 provinces of Türkiye and in Iraq, Azerbaijan, Moldova and the USA, from the humid Black Sea climate to the hot Mediterranean coast. You can see all of them on the map and in the list on our projects page.

Cost and timing

What does the cost of a greenhouse depend on?

There is no single price per square metre. The cost depends on the size of the greenhouse and the crop (gutter height and crop load follow from it), the wind and snow loads of the site, the cladding (film or polycarbonate), the heating, cooling and ventilation systems, the level of fertigation and automation, site work such as excavation and levelling, and the delivery model.

That is why we calculate the project before we quote. The quotation states the materials, sections and equipment to be used.

What information do you need for a quotation?

The location of the site, the area you want to build (m² or decares) and the crop you want to grow are the basis of every quotation. If you have them, details of the plot, the water source and power supply, the systems you want (such as heating or automation) and your investment timeline make the calculation more precise. You can fill in the quotation form, call us or write to us on WhatsApp.

How long does it take to build a greenhouse?

It depends on the size of the greenhouse, the scope (structure only or turnkey), the state of the site and the season. Our workflow has five steps: survey and feasibility, project and design, fabrication of the structure and equipment, installation on site, and automation and commissioning. We set the schedule for your project together at the quotation stage.

Greenhouse systems

Should I build a soil-based or a soilless greenhouse?

In a soilless system the plants grow in a substrate such as cocopeat or rockwool, in hanging or multi-tier gutters. Soil-borne diseases and nematodes are no longer a risk, water and nutrients are dosed under control, and a closed drainage loop can save up to 30% of water and fertiliser. For some crops, such as banana, soil-based greenhouses are common; all of our banana greenhouses are soil-based. We choose the right system with you based on the crop, your water and your target yield.

What is a gothic greenhouse, and why is it your standard?

A gothic greenhouse is a multi-span, gutter-connected modern greenhouse with a pointed-arch roof. Its high gutters and large air volume buffer sudden swings in temperature and humidity, and it can carry heavy crop loads. Our tunnel spans are 8.00, 9.60, 10.00 and 12.80 m, and the gutter height is between 4.00 and 7.50 m depending on the crop.

Are your greenhouses built for wind, snow and earthquakes?

Every structure is engineered for 80–120 km/h wind speeds and 25–40 kg/m² snow loads, with an EN 13031-1 structural calculation specific to the project region; the calculation also covers the seismic load of the site. The steel is hot-dip galvanised at 275–450 g/m² and nothing is welded on site: welding burns the galvanising and leads to rust, so every joint is bolted or clamped.

Why does the gutter height matter, and how high should it be?

The gutter height sets the air volume of the greenhouse and the space the crop has to grow. It is chosen by crop: we recommend 4.00–5.00 m for strawberry, at least 5.0 m (usually 5.0–6.0 m) for tomato and 6.50–7.50 m for banana.

Which cladding do you use?

Our standard is polycarbonate gables and side walls with a 36-month UV+IR+EVA+AD greenhouse film. The final choice depends on the crop, the regional climate and the budget, and is set in the project. Our group also manufactures, imports and exports greenhouse film and greenhouse clips.

Do you also install climate control, irrigation and automation?

Yes. Our own electromechanical team installs climate control, ventilation and fogging; radiation-based automatic fertigation; water treatment and reverse osmosis; pipe heating and boiler rooms; and the climate computer that runs them all. We integrate systems from brands such as Ridder, Hortimax, Munters, Grundfos and İnta.

Do you build geothermally heated greenhouses?

Yes. We provide end-to-end engineering: preliminary resource assessment, heat-load calculation, heating plant design, cascade use and re-injection, working with geological engineers and specialist groups. Reference: a geothermally heated strawberry greenhouse in Sarayköy, Denizli.

Investment and support

Do you prepare a feasibility study before the investment?

Yes. We analyse the site, climate, crop and market; build the investment cost, operating cost and cash-flow model; and prepare the investor presentation. Structural, electromechanical and investment calculations are done by one team, so you deal with one contact.

Can I get grants, incentives or loans for a greenhouse investment?

In Türkiye there are public grant programmes, investment incentives and interest-supported agricultural loans for greenhouse investments. Which one fits depends on the location and size of the project and on the investor; rates and application periods are set again every year. As part of our feasibility service we prepare the technical and financial file needed for bank loan, grant and incentive applications.

Do you work in specialised greenhouse industrial zones (OSB)?

Yes. We have built greenhouses in many of Türkiye's agriculture-based specialised industrial zones and carry out layout, structural design, electromechanical design, quotation and feasibility work for parcel owners. We also advise zone managements on water supply, central storage and treatment, energy and shared infrastructure.

Projects abroad

Do you build greenhouses outside Türkiye?

Yes. Besides Türkiye we have completed projects in Iraq, Azerbaijan, Moldova and the USA. We work with three delivery models: material supply FCA Mersin; supervised assembly, where our site manager comes with the material and your local crew assembles under his direction; and turnkey, from structural design to operator training. SY-ASER GmbH in Germany is a local point of contact for European investors.

Where are the materials made?

We detail the steel structure to each project's own fabrication drawings, source the raw material directly and have it produced in contracted facilities in the Mersin and Antalya region. Quality and cost control stay with us from design to fabrication, and production close to the port makes shipping abroad easier.

Installation and after

Do you also prepare the site?

Yes. With our group's construction machinery we carry out excavation and fill, levelling and retaining walls, and bring the site to the point where the greenhouse can go up, from a single source.

Do you provide support after installation?

Yes. After commissioning we train the operators and provide remote technical support. Responsibility from design to commissioning stays with us, so you deal with one contact.

Let's plan your greenhouse project together

Send us your greenhouse project request using our online form. Our expert team will get back to you shortly!

Your details are carried over to the quote form; personal data is processed under our Privacy Notice (KVKK).

WhatsApp