What Is a Greenhouse OSB?

Last updated: 24 November 2026

Greenhouse OSBs are special zones set up so that modern greenhouse investments can be made in a planned area, with ready infrastructure and under a single management. Their official name is “Agriculture-Based Specialised Organised Industrial Zone” (Tarıma Dayalı İhtisas Organize Sanayi Bölgesi, TDİOSB); they are commonly called “greenhouse OSBs” or “organised agricultural zones”. They are approved by the Ministry of Agriculture and Forestry and run under the OSB legislation.

The idea is the same as an industrial OSB. Instead of buying farmland and building the road, power, water and heat infrastructure alone, the investor is allocated a parcel whose infrastructure is ready and whose zoning and parcelling are approved, and moves straight on to building the greenhouse. In zones with a geothermal source, heat is also brought to the parcel through a shared line. This considerably cuts heating, the largest operating cost of a greenhouse.

Who sets them up and who runs them?

Zones are usually set up jointly by local bodies such as the governorship, the special provincial administration, the municipality, the chamber of commerce and industry and the commodity exchange. The zone in Yerköy, Yozgat, for example, was founded jointly by the Yozgat Governorship Special Provincial Administration, Yerköy Municipality, the Yerköy Chamber of Commerce and Industry and the Yerköy Commodity Exchange, and became a legal entity with the approval of the Ministry of Agriculture and Forestry.

During set-up, an entrepreneur board made up of the founding bodies’ representatives runs the work. Once the zone is operating, a board of directors and the zone directorate take over. The zone directorate handles parcel allocation, project approval, building and occupancy permits and the upkeep of shared infrastructure from a single office.

What does a zone contain?

  • Greenhouse parcels: Most of the zone. The Edremit project, for example, covers about 640,000 m², of which about 335,000 m² is set aside for greenhouses.
  • Agro-industry parcels: For packing, cold storage, drying, processing and logistics facilities, so production and market preparation can happen in the same zone.
  • Shared infrastructure: Internal roads, power distribution, mains and irrigation water, wastewater and drainage, a geothermal heat network where available, a management building and social areas.

The investor process, step by step

  1. Pre-allocation request: The zone management opens a call for a set period; investors state the parcel size and investment topic they want. In Yerköy, for example, the deadline for the second pre-allocation period of 2026 is 30 November 2026, 17:00.
  2. Evaluation and allocation: Applications are assessed on investment size, employment, financial capacity and project suitability. An allocation contract is signed with the investors found suitable; the land price is paid up front or in instalments.
  3. Project and permits: The investor has the greenhouse and facility designs approved by the zone directorate. The building permit is issued by the zone directorate instead of the municipality.
  4. Construction: Construction must start, and production begin, within the periods set in the contract. If they are missed, the allocation can be cancelled; this rule stops land being held for speculation.
  5. Operation: The investor pays the zone management a contribution and service fees for the shared infrastructure and heat. Heat, water and power are supplied through the zone’s systems.

Advantages for the investor

  • Ready, legal infrastructure: Zoning, parcelling and infrastructure are already settled, so set-up is faster.
  • Low heating cost: In geothermal zones, greenhouse heating costs far less than with fossil fuels, which makes winter production economical.
  • Loan advantage: Treasury-subsidised agricultural loans give investments in an organised agricultural zone an extra 15% interest discount. Grants & Incentives →
  • Economies of scale: Packing, storage and logistics in the same zone make market access easier and give buyers a single, regular supply point.
  • One-stop procedures: Permits, occupancy and infrastructure connections all go through the zone directorate.
  • Jobs and regional development: Zones are set up with large employment targets. The Edremit zone is expected to employ about 1,500 people once it is operating.

What investors should watch

  • The construction start and production deadlines in the allocation contract are binding.
  • Heat, water and service fees differ from zone to zone and must be included in the feasibility study.
  • The temperature and flow rate of the geothermal water should be checked against the greenhouse’s heat demand in advance; the greenhouse design, heating system and parcel layout are based on these figures.

What Sera Mekatronik does in this process

We work alongside the investor in greenhouse OSBs, from choosing the parcel to starting production:

  • Layout and capacity study for the parcel
  • Geothermal heat demand calculation
  • Feasibility report for the pre-allocation application
  • Greenhouse and facility designs for the zone directorate
  • Turnkey greenhouse construction

With our project experience in the Dikili Agriculture-Based Specialised OSB, we know the technical processes run with zone managements first-hand. We also contribute to design and infrastructure work for zones still to be set up.

Allocation terms, fees and support rates depend on each zone’s own regulations and call period. Get current information from the zone directorate concerned.

Let's plan your greenhouse project together

Send us your greenhouse project request using our online form. Our expert team will get back to you shortly!